Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Desarrollo tardío")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 276

  • Page / 12
Export

Selection :

  • and

Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterionKASPERSKI, Adam.Operations research letters. 2005, Vol 33, Num 4, pp 431-436, issn 0167-6377, 6 p.Article

Bi-criteria scheduling problem on three identical parallel machinesMOHRI, S; MASUDA, T; ISHII, H et al.International journal of production economics. 1999, Vol 60-61, pp 529-536, issn 0925-5273Conference Paper

Evolution d'une prairie de fauche sub-montagnarde sous l'effet d'une fertilisation organique et d'un fauchage tardifLUXEN, P; PHILIPPE, A; ROUXHET, S et al.Fourrages (Versailles). 2008, Num 195, pp 346-348, issn 0429-2766, 3 p.Conference Paper

On falling behind scheduleANDERSON, D. B.Journal of scholarly publishing. 1998, Vol 29, Num 4, pp 212-218, issn 1198-9742Article

Clinical presentation of late-onset schizophreniaHARRIS, M. J; CULLUM, C. M; JESTE, D. V et al.The Journal of clinical psychiatry. 1988, Vol 49, Num 9, pp 356-360, issn 0160-6689Article

Embryogenèse tardive chez P.bCHEN ZU-KENG; WANG FU-HSIUNG.Zhíwù fenlei xuébào. 1986, Vol 24, Num 6, pp 458-463, issn 0529-1526Article

An efficient configuration generation mechanism to solve job shop scheduling problems by the simulated annealing algorithmWANG, T.-Y; WU, K.-B.International journal of systems science. 1999, Vol 30, Num 5, pp 527-532, issn 0020-7721Article

Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum latenessALLAHVERDI, A.Computers & operations research. 1996, Vol 23, Num 10, pp 909-916, issn 0305-0548Article

Scheduling jobs on several machines the job splitting propertySERAFINI, P.Operations research. 1996, Vol 44, Num 4, pp 617-628, issn 0030-364XArticle

The single-machine scheduling problem to minimize total tardiness subject to minimum number of tardy jobsVAIRAKTARAKIS, G. L; CHUNG-YEE LEE.IIE transactions. 1995, Vol 27, Num 2, pp 250-256, issn 0740-817XArticle

Improving the preemptive bound for the single machine dynamic maximum lateness problemDELLA CROCE, F; T'KINDT, V.Operations research letters. 2010, Vol 38, Num 6, pp 589-591, issn 0167-6377, 3 p.Article

Sugarcane and its problems. Effect of cropage on the quality of early, mid and late maturing varieties of sugarcaneTANEJA, A. P; PUNIA, M. S; CHAUDHARY, B. S et al.Indian Sugar. 1986, Vol 36, Num 4, pp 155-159, issn 0019-6428Article

On the representation of the one machine sequencing problem in the shifting bottleneck heuristicMUKHERJEE, Saral; CHATTERJEE, A. K.European journal of operational research. 2007, Vol 182, Num 1, pp 475-479, issn 0377-2217, 5 p.Article

Self-report measures of employee lateness : Conceptual and methodological issuesKOSLOWSKY, Meni; DISHON-BERKOVITS, Miriam.European journal of work and organizational psychology (Print). 2001, Vol 10, Num 2, pp 145-159, issn 1359-432XArticle

A major gene for flowering time in almondSOCIAS I COMPANY, R; FELIPE, A. J; GOMEZ APARISI, J et al.Plant breeding. 1999, Vol 118, Num 5, pp 443-448, issn 0179-9541Article

Response of cassava (Manihot esculenta Crantz) to shade under field conditionsOKOLI, P. S. O; WILSON, G. F.Field crops research. 1986, Vol 14, Num 4, pp 349-359, issn 0378-4290Article

Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release datesLIN, Shih-Wei; LEE, Zne-Jung; YING, Kuo-Ching et al.Computers & operations research. 2011, Vol 38, Num 5, pp 809-815, issn 0305-0548, 7 p.Article

Single-machine scheduling with waiting-time-dependent due datesKOULAMAS, Christos; KYPARISIS, George J.European journal of operational research. 2008, Vol 191, Num 2, pp 576-580, issn 0377-2217, 5 p.Article

The single machine batching problem with identical family setup times to minimize maximum lateness is strongly NP-hardLU, L. F; YUAN, J. J.European journal of operational research. 2007, Vol 177, Num 2, pp 1302-1309, issn 0377-2217, 8 p.Article

Scheduling multiprocessor tasks on two parallel processorsBLAZEWICZ, Jacek; DELLOLMO, Paolo; DROZDOWSKI, Maciej et al.Operations research. 2002, Vol 36, Num 1, pp 37-51Article

A survey on the resource-constrained project scheduling problemÖZDAMAR, L; ULUSOY, G.IIE transactions. 1995, Vol 27, Num 5, pp 574-586, issn 0740-817XArticle

Relationship of flowering time, rate of seed germination, and time of leaf budbreak and usefulness in selecting for late-flowering applesMEHLENBACHER, S.A; WOORDECKERS, A.M.Journal of the American Society for Horticultural Science. 1991, Vol 116, Num 3, pp 565-568, issn 0003-1062, 4 p.Article

Double-Stranded RNA-Mediated Downregulation of pdhk Gene Expression to Shorten Maturation Time of a Late Maturing Native indica Rice Cultivar, BadshahbhogMUKHERJEE, Rajeswari; GAYEN, Srimonta; CHAKRABORTY, Anirban et al.Crop science. 2012, Vol 52, Num 4, pp 1743-1753, issn 0011-183X, 11 p.Article

Dynamic job shop scheduling for missed due date performanceALPAY, Serafettin; YÜZÜGÜLLÜ, Nihat.International journal of production research. 2009, Vol 47, Num 15, pp 4047-4062, issn 0020-7543, 16 p.Article

A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setupsXIULI WANG; CHENG, T. C. E.Computers & operations research. 2006, Vol 33, Num 5, pp 1326-1344, issn 0305-0548, 19 p.Article

  • Page / 12